SMRC, WA

In May 2006, RDT was successfully awarded the contract to design, install and commission a new MRF facility for Southern Metropolitan Regional Council in Perth. SMRC is an amalgamation of 9 local councils. The facility operates at 25 tph, processing approximately 1000 tonnes of waste per week.

Project Duration: 28 weeks - Plant Operational July 2007

Major Equipment utilized in the new MRF:

  • Double Deck OCC and ONP Screens
  • Optical Plastic Sorters x 3
  • Glass Sorting System
  • Overbelt magnet
  • Vibratory Feeder
  • Dual Waste Packer
  • Plastic/Steel/Aluminium Baler
  • Eddy Current
  • Glass Fines Blower System
  • Various Conveyors
  • Sort Platforms, stairs and walkways

Role: Principal Contractor